Skip to content
Drone view of a clay-tile roof renovated by our roofers in the Lille area

RGE-certified roofers in the Lille area

Renovation, roofing, waterproofing, repairs: one team for all your roofing work, RGE Qualibat certified.

RGE Qualibat Certified since 2025
10-year warranty Insured with SMA BTP
Free quote Reply within 48h
Lille metro area Local service

Our services

Everything to do with your roof

From full renovation to one-off repairs, we cover every roofing need.

All services

Roof renovation

Full or partial refurbishment of your roof, whatever the material, done to the highest standards and covered by a 10-year warranty.

  • Tiles
  • Slate
  • Zinc
  • Steel sheeting
  • Waterproofing

Thermal insulation

Up to 30% of heat escapes through the roof: we insulate from outside, with sarking or a thin vapour-permeable insulation, to cut your bills.

  • Sarking: rigid boards over the rafters
  • External insulation, no loss of living space
  • 5.5% VAT & RGE grants

Flat-roof waterproofing

Flat roofs and terraces sealed for the long term with EPDM or bituminous membranes.

  • EPDM membrane
  • Torch-on bitumen
  • Flat roofs & terraces

Repairs

Leak, blown tile, damaged flashing: we repair and restore your roof, cleanly.

  • Leak detection
  • Lasting repair
  • Clear quote

Moss removal & upkeep

Cleaning, moss removal and water-repellent treatment to extend your roof’s life.

  • Moss removal
  • Water-repellent treatment
  • Maintenance plan

Inspection & assessment

Unsure about your roof’s condition? We give you a clear assessment before any commitment.

  • Full inspection
  • Report & advice
  • Transparent quote

Our method

The stages of a roof renovation

From the first visit to the finishing touches, here is how your roof renovation unfolds. Open a stage to see the details.

  1. 01 Roof survey
    Roof being renovated: old tiles on one side, new tiles on the other

    Before any quote, our site manager inspects your roof on site and takes every measurement. They check its overall condition and spots the work to plan for: repairing or straightening the roof frame, replacing roof windows… The detailed quote is free.

  2. 02 Planning permission
    Town hall façade with the French and European flags

    Changing the roofing material, insulating the roof from the outside (sarking), adding or enlarging a roof window or altering the roof frame requires a prior declaration (déclaration préalable) at the town hall (article R*421-17 of the French planning code). Some town halls in the Lille area now ask for one even for a like-for-like re-roof, so we recommend filing one for any full roof renovation.

    This free application must be prepared and filed by the owner or their architect: we cannot do it on their behalf. File it at least four months before the works start, as processing can take a while depending on the town hall. Our guide explains step by step how to prepare it and file it online.

  3. 03 Scaffolding
    Brick house surrounded by scaffolding before its roof renovation

    Work starts with the scaffolding, essential to reach the roof and work safely. We handle every town-hall formality and pay the public-space occupancy fees for the whole job.

  4. 04 Stripping the old roof
    Bare roof frame after the old covering was removed

    We remove the old covering to expose the roof frame; interior insulation can be kept. We take all waste away, and tiles, slates, wood and metal are recycled. An underlay goes on straight after stripping, so the frame stays dry throughout the job.

  5. 05 Roof insulation
    Rigid insulation boards laid on the roof, external insulation

    Replacing the covering is the moment to insulate the roof from outside: with a thin multi-layer vapour-permeable insulation, or with rigid boards laid as sarking, the most effective method. The insulation and its thickness are chosen after a study of your needs and of how the rest of the house is insulated.

  6. 06 Laying the new roof
    New tiles being laid on battens and underlay

    Next comes the new covering, laid over the external insulation when there is one. The laying technique depends on the material: tiles, slate, zinc, steel sheeting…

  7. 07 Finishing
    Zinc flashing where a newly tiled roof meets a brick wall

    Depending on the job, we also create roof openings, fit roof windows and handle other finishing work, including replacing rainwater drainage: gutters, box gutters…

Projects

The work speaks for itself

Browse our recent jobs and follow them day to day on Instagram.

All projects

Certifications & guarantees

  • RGE Qualibat
  • Chambre de Métiers et de l’Artisanat
  • SMA BTP

Partners & suppliers

  • Velux
  • Skylux
  • BMI
  • Unilin
  • Würth
  • Asturienne
  • Toitmat

Contact

A roofing project? Let’s talk.

Free quote, no obligation. We come out, assess the work and get back to you within 48 hours.

Request a quote

First contact by email through the form on this site.